The 5S tool is used for improving organization of a physical or digital work space, the name comes from the five steps required to implement and the words (each starting with S) used to describe each step: sort, set in order, scrub, standardize, and sustain.
Completion of a 5S event results in the following benefits:


The affinity diagram works by helping the team organize large numbers of ideas, usually as the result of a brainstorming session. The process allows team members to organize the ideas by category and look at the problem or issues from a new perspective of relationships and patterns.
You can use affinity diagrams to:
The six steps to an affinity diagram are:
• State the problem
• Brainstorm ideas
• Record ideas (often brainstorm and record happen simultaneously)
• Sort ideas
• Identify common themes or categories
• Create the diagram based on ideas and categories
In the example below the problem is listed as: what are the glitches in our content creation process. The 3 different images show the step of brainstorming ideas, then the step of recording and sorting those ideas, then the step of identifying common themes or categories combined with creating the diagram based on ideas and categories.



STEP 1:
STEP 2:
STEP 3:
A prioritization/ decision making tool. ICE is an acronym for the three factors that should be considered whenever priorities are set: impact, cost and effort. For some decisions the top priorities are different, ICE can still be used by changing from impact, cost, and effort to whatever is more appropriate.
As a team decide on the different ideas/solutions for the problem (in this case where to go on vacation). Then discuss how you will determine the impact, control, and ease of each idea/solution. In some cases it may be necessary to change impact, control, and ease, to other factors affecting your decision. The attached form is editable, so you or your team can download and edit it however you see fit.
As you may have noticed, the same example was used with the PACE Tool, with slightly different results. ICE and PACE are both useful when you are trying to decide between different options as a team or an individual. It's really a matter of preference when deciding when to use one or the other.

The PACE Prioritization Tool is used to prioritize a list of countermeasures or ways to solve a problem. PACE stands for: Priority, Action, Consider, Eliminate. These four categories reflect the order in which countermeasures (or solutions you're deciding between) should be implemented and/or eliminated from consideration.
The PACE Prioritization Tool consists of 5 steps:
1) Number all the ideas and determine as a team what your definition for “high” and “low” implementation effort will be. Similarly, determine as a team what your definitions for “high” and “low” anticipated benefits will be.
2) Use the provided grid or draw the PACE matrix on a white board
3) Take each improvement idea and as a team decide what level of effort it would be and how much of a benefit to the organization / customer based on the previously decided criteria. Plot each idea on the chart.
4) Draw the PACE lines. Evenly space the lines along the top of the chart and draw a freehand arc and add PACE letters on top. Refer to the competed PACE matrix below as an example.
5) Using the criteria below move forward with the projects as per the matrix. Now your team can sort the ideas based on the following:



A swimlane diagram is a type of flowchart that delineates who does what in a process. Using the metaphor of lanes in a pool, a swimlane diagram provides clarity and accountability by placing process steps within the horizontal or vertical “swimlanes” of a particular employee, work group or department. It shows connections, communication and handoffs between these lanes, and it can serve to highlight waste, redundancy and inefficiency in a process.
Swimlanes can be used in the initial stages of project management to map which departments/individuals will be responsible for what steps and on what timeline. This type of swimlane will look similar to the first example below.
Swimlanes can also be used slightly similarly to the Spaghetti diagram where a process is being mapped out with the end goal of improving that process as seen with the second example of the pizza place.